Gasoline Passenger Carriers J3A

Short Description:


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Product Detail

    FAQ

    Product Tags

    Overall Size 2760*1320*1790mm
    Cargo Box Size 1295*1300*435mm
    Engine Type Four stroke/water-cooling/ Zongshen 200CC
    Rated Power 10.5kw @ 7000rpm
    Max. torque 14.5N.m @ 5500rpm
    Cylinder Bore* Stroke φ63.5mm×62.5mm
    Ignition Mode DC CDI
    Compression Ratio 10:01
    Transmission 5 speed + 1 reverse gear
    Transmitting Mode Shaft transmitted
    Gear Ratio 37:13
    Front Suspension φ 45 double rocker arm shock absorber
    Rear Suspension Type Trailing arm dependent suspension
    Rear Shock absorber Spring damping shock absorber
    Rear Axle Chang’an entire floating rear axles/37:13/Φ60*4 axle tube/without power gearbox
    Min. Turning Radius 5500mm
    Min. Ground Clearance 150mm
    Tyre (F/R) 4.00-12
    Brake Type Oil brake
    Brake Mode Drum / drum
    Max. Speed 60km/h
    Fuel Tank Capacity 17L
    Gas Tank Capacity 28L
    Mileage Per Charge 600km
    Curb Weight 470kg
    Rated Gross Weight 750kg
    Max. Designed Gross Weight 750kg
    40HQ Container Packing Qty. CKD 25sets
    Features 1. LPG & gasoline hybrid for long endurance
    2. The comprehensive gas consumption is 3.6kg/100km, thus saving more money and more economical
    3. The oil brake system is safer and more reliable
    4. Zongshen 200 water-cooling engine has strong power, safe and reliable
    5. Automotive grade rear suspension system with damper spring compound shocker absorption, safer and more comfortable


  • Previous:
  • Next:

  • Q1: Can I have samples before mass production?
    A:Yes,we have sample stock in Munster, German, you can order sample first. Please notice that our sample price is different from mass production pricesQ2: Do you have overseas service center?
    A: Yes, we have service centers in Europe and we provide call center, maintenance, spare parts, logistics and warehousing services covering the whole of Europe, support door to door transport, returning process etc.Q3:Do you accept OEM or ODM?
    A:Yes we would accept OEM in certain year purchase quantity. Right now the minimum order quantity is 10,000 per year.Q4:Can I add my own logo or choose my own colors?
    A:Yes you can. But for change logo and colors, the MOQ is 1000 pieces per order or for specific discussion.

    Q5: Do you have e-bike, e motorcycle?
    A: Yes we have e-bike and e motorcycle, but currently we cannot do dropshipping support.

    Q6:What is the payment term?
    A:For sample order,it’s 100% TT advance.
    For mass production order,we accept payments TT, L/C,DD,DP, Trade Assurance.Q7:What is your delivery time?
    A: For sample order,it should take 2 week to prepare and shipping time depends on distance from our warehouse in Europe or US to your office location
    For mass production order,it will take 45-60 days of production and shipping time depends on sea freightQ8: What certificate do you have?
    A: We have CE,TUV, KBA, FCC,MD, LDV, RoHS, WEEE etc. Also we can provide any certificate relates to products.Q9: How does your factory perform quality control?
    A: We would start quality control process since the beginning of production. During the whole process we would proceed
    IQC,OQC,FQC, QC, PQC and etc.

    Q10:.What’s your after-sales service like?
    A:The whole product warranty of our product is 1 year, and for agents, we will send some spare parts and provide maintenance video to help them repair together. If it is the cause of the battery or the damage is serious,we can accept the refurbishment of the factory.

    Q11: Where is your factory located? How can i visit your factory?
    A: We are a group company, different product produced in different city due to we are making full use of industrial resources and supplying chain, now we have more than 6 production bases of electric scooters in Zhejiang, Guangdong ,Jiangsu, Tianjin etc. Please contact us for arrange visits.

     

  • Write your message here and send it to us